Home
Products
About Us
Factory Tour
Quality Control
Contact Us
Request A Quote
News
SHANGHAI UNITE STEEL
Home ProductsCold Drawn Steel Tube

34CrMo4 Cold Drawn Steel Tube For Cold Rolled Mechanical DIN 2391 Seamless

China SHANGHAI UNITE STEEL certification
China SHANGHAI UNITE STEEL certification
I'm Online Chat Now

34CrMo4 Cold Drawn Steel Tube For Cold Rolled Mechanical DIN 2391 Seamless

34CrMo4 Cold Drawn Steel Tube For Cold Rolled Mechanical DIN 2391 Seamless
34CrMo4 Cold Drawn Steel Tube For Cold Rolled Mechanical DIN 2391 Seamless 34CrMo4 Cold Drawn Steel Tube For Cold Rolled Mechanical DIN 2391 Seamless 34CrMo4 Cold Drawn Steel Tube For Cold Rolled Mechanical DIN 2391 Seamless 34CrMo4 Cold Drawn Steel Tube For Cold Rolled Mechanical DIN 2391 Seamless

Large Image :  34CrMo4 Cold Drawn Steel Tube For Cold Rolled Mechanical DIN 2391 Seamless

Product Details:
Place of Origin: China
Brand Name: UST
Certification: ISO 9001
Model Number: OD: 10-500mm; WT: 2-50mm
Payment & Shipping Terms:
Minimum Order Quantity: MOQ: 5 ton
Price: USD 800- 3000/ton
Packaging Details: Plastic plugs in both ends, Hexagonal bundles of max 2,000kg with several steel strips, Two tags on each bundle, Wrapped in waterproof paper, PVC sleeve, and sackcloth with several steel strips.
Delivery Time: Within 15-35 days
Supply Ability: 1000 ton/month
Detailed Product Description
Usage: Mechanical Tubing Production Technique: Cold Drawn
Surface: Smooth Delivery Condition: BKS, NBK,BK ,BKW, GBK(+A), NBK(+N), BK(+C)
End Protector: Plastic Pipe Cap
High Light:

Cold Drawn Seamless Tube

,

Cold Drawn Stainless Steel

DIN 2391 Seamless Cold Drawn Steel Tube for cold rolled mechnical purpose 34CrMo4

 

 

Size Range

 

OD 10-500mm

Thickness 2-50mm

Length Any Length Below 12 Meter

 

Standards

 

DIN 2391 Seamless Precison Steel Tubes

BS6323 Specification for Seamless and Welded Steel Tubes for Automobile, Mechanical and General Engineering Purposes

ASTM A519 Standard Specification for Seamless Carbon and Alloy Steel Mechanical Tubing

 

Material

 

GB/T Q215 Q235 

DIN St37, St52,

ASTM 1020,1045,4140,4130...

EN E335,S355JR,S355J2...

JIS SS330,SS400,SPFC590

 

Applications

 

Used For Water, Gas, Stream, Combustible Fluids and construction

 

Ends

Plain, Beveled, Thread With Couplings Or Sockets;

Plastic Caps And Steel Rings Can Be Provided If Possible

 

Surface

Bared, Galvanized, Oiled, Color Paint, 3PE; Or Other Anti-corrosive Treatment

 

Inspection

With Chemical Composition and Mechanical Properties Analysis;

Dimensional and Visual Inspection, Also With Nondestructive Inspection

 

Techniques

Cold drawn, hot rolled+cold drawn

 

Package

Hexagon Shape Bundle, Covered With Tarpaulin, Containers Or In Bulk

 

Date of Delivery

15-35 DAYS after receive your down payment or L/C

 

Method of Payment

T/T L/C

 

Dimension Tolerance

 

I.D tolerance (mm)

O.D tolerance (mm)

I.D Roughness (µm)

Straightness (mm/meter)

H7-H9

-/+0.5%

0.10-0.80

0.2-0.80

Chemical Composition(%)

Grade

C

Si

Mn

P

S

Cr

Mo

34CrMo4

0.30-0.37

0.10-0.40

0.60-0.90

0.030max

0.030max

0.90-1.20

0.15-0.30

 

Our Services

 

Third Party inspection acceptable. such as SGS, BV etc.

Supplying financial support with usance L/C 180 days after B/L date.

 

34CrMo4 Cold Drawn Steel Tube For Cold Rolled Mechanical DIN 2391 Seamless 0

 

 

What we can offer?

 

-We offer a wide range of steel products in a wide variety of dimensions and executions, according to the common international specifications or customize.

-Machining and heat treatment are available.

-Also, we advise you in choosing the right materials.

 

 

Quality Assurance

 

Below inspection will be done in the production.
(1) ray detection---RT;
(2) ultrasonic testing---UT;
(3) Magnetic Particle Testing-MT;
(4) penetration testing-PT;
(5) eddy current flaw detection-ET

 

34CrMo4 Cold Drawn Steel Tube For Cold Rolled Mechanical DIN 2391 Seamless 1

 

Package

 

In standard export packing and seaworthy material with hexagon shape bundle, covered with tarpaulin, in containers or in bulk, or upon request

34CrMo4 Cold Drawn Steel Tube For Cold Rolled Mechanical DIN 2391 Seamless 2

 

Payment & Delivery

 

1. Both T/T and L/C will be acceptable

2. Trade Terms: FOB, CIF, CFR

3. The delivery will be in 10-15 days if have stock; For customized items, the delivery will be negotiated by both parties

4. Shipping by sea freight from Shanghai Port (PRC) for Bulk orders, by airfreight or express for samples

 

Company Information

 

Shanghai Unite Steel Trading Co., Ltd

We are committed to integrate engineering steel resources in china and serve the global engineering steel market. Our company has more than 15 years of experience in steel researching, production, managing and sales. And our team mostly are based on and worked in national famous steel enterprise.

In the aspect of resources and information, we have established cooperative and stronger relationship with nearly hundred enterprises, either state-owned or private owned in china.

What’s more, we have built long, deep and close business relationship with dozens of steel company, Sharing and holding equities with several steel enterprises. Because of the close cooperation with steel companies and our pioneering spirit, which can ensure us stay at the top competition, and ensure our customers get what they really want!

34CrMo4 Cold Drawn Steel Tube For Cold Rolled Mechanical DIN 2391 Seamless 334CrMo4 Cold Drawn Steel Tube For Cold Rolled Mechanical DIN 2391 Seamless 434CrMo4 Cold Drawn Steel Tube For Cold Rolled Mechanical DIN 2391 Seamless 534CrMo4 Cold Drawn Steel Tube For Cold Rolled Mechanical DIN 2391 Seamless 634CrMo4 Cold Drawn Steel Tube For Cold Rolled Mechanical DIN 2391 Seamless 734CrMo4 Cold Drawn Steel Tube For Cold Rolled Mechanical DIN 2391 Seamless 834CrMo4 Cold Drawn Steel Tube For Cold Rolled Mechanical DIN 2391 Seamless 934CrMo4 Cold Drawn Steel Tube For Cold Rolled Mechanical DIN 2391 Seamless 1034CrMo4 Cold Drawn Steel Tube For Cold Rolled Mechanical DIN 2391 Seamless 1134CrMo4 Cold Drawn Steel Tube For Cold Rolled Mechanical DIN 2391 Seamless 12

 
FAQ

 

Q: Are you a manufacturer or merely a trader?
A: We are group of companies and owned manufacturer bases and trading company. We specialized in special steel which include alloy structural steel and carbon steel and stainless steel, etc. All material are with high quality and competitive price. 
 
Q: How do you guarantee the quality of your product?
A: Firstly, we can provide the certificates from the third party, such as TUV, CE, if you need. Secondly, we have a complete set of inspection system and every process is checked by QC. Quality is the lifeline of enterprise survival.
 
Q: Delivery time?
A: We have ready stock for most of material grades in our warehouse. If the material doesn't have stock, the delivery lead time is about 5-30 days after receiving your prepayment or firm order.
 
Q: What is the payment term?
A: T/T or L/C.
 
Q: Can we visit your company and factory?
A: Yes, warmly welcome! We can book the hotel for you before you come to China and arrange our driver to our airport to pick you up when you come. 

34CrMo4 Cold Drawn Steel Tube For Cold Rolled Mechanical DIN 2391 Seamless 13

Contact Details
SHANGHAI UNITE STEEL

Contact Person: Anndy

Tel: +8615502127172

Send your inquiry directly to us (0 / 3000)